Least-Cost Corridors (i.e. Relative Priority of each path in a Linkage) (v008) Modoc

Jul 28, 2017 (Last modified Dec 1, 2017)
Description:
This can be thought of as the relative priority of each path within a linkage, with all linkages mapped at once. This is also known as least-cost corridor.

To see how this is used, and to see links to its core and resistance layer inputs, the reports, diagrams, and presentations, see an output that uses this layer, such as Connectivity for Modoc (w/Cores 0.6 - 1.0)


Data Provided By:
CBI
Content date:
not specified
Contact Organization:
CBI
Contact Person(s):
Use Constraints:
Creative Commons LicenseThis work is licensed under a Creative Commons Attribution 3.0 License.
Layer:
Layer Type:
Currently Visible Layer:
All Layer Options:
Layers in this dataset are based on combinations of the following options. You may choose from these options to select a specific layer on the map page.
Description:
Spatial Resolution:
Credits:
Citation:
Purpose:
Methods:
References:
Other Information:
Time Period:
Layer Accuracy:
Attribute Accuracy:
FGDC Standard Metadata XML
Click here to see the full FGDC XML file that was created in Data Basin for this layer.
Original Metadata XML
Click here to see the full XML file that was originally uploaded with this layer.
This dataset is visible to everyone
Dataset Type:
Layer Package
Downloaded by 3 Members
Bookmarked by 1 Group
Included in 2 Public Maps
Included in 1 Public Gallery

About the Uploader

Conservation Biology Institute

We provide advanced conservation science, technology, and planning to empower our partners in solving the world’s critical ecological challenges